Phantom Trail Riders Meeting Minutes 11/01/07

OLD BUSINESS
 
Pegboard still needs to be installed above bench for tools
Cold weather 4' fluorescent light has been ordered through Hardware Hank  (John will check into this)
Proposal to build sign racks inside enclosed room at new building (build this winter when signs are out)
Install Phantom Trail Riders sign at Fairgrounds building  (Don & Rick will do this)
Industrial park has new building planned, will affect access route to Country Store
Sign Changes:
  - Stop A Sec is now Holiday
  - Add Hummer's Rendezvous
  - Amoco is now BP/Subway
  - Add Gateway Plaza
Need to add rear lights to Orange Drag  (John will do this)

NEW BUSINESS
 
Wire and plumb air compressor
Anchor air compressor
West Carey bridge needs work
John will ask Jim Nelson about shutting down the old airport trail
UW Extension is having a meeting regarding the Gandy Dancer Trail on November 14th
Work Days:
  - 11/03/07  Meet at Phantom building  9:30 AM
  - 11/10/07  Meet at Phantom building  9:30 AM

POSTPONED BUSINESS

 
Look into installing stop signs for snowmobile traffic in alley behind Legion at Main Street (T.A. and John)
Tubes to be installed in drag travel tires (John will get this done)
Add 55mph Dusk to Dawn signs where trails exit town  (T.A. and John)
County would like a pipe on the groomer that can have cones stacked for emergency situations while grooming (John)

 Next Meeting:
                        Thursday, December 6th 2007
                        7:00 PM
                        American Legion
Home